From what I can see, the first Ready for Service dates for Maryborough are in the 1st Half of 2018. This wiill cover less than 20% of the town. The rest of the town will be up and running in the 2nd Half of 2018.
The fixed Wireless services (which are for properties outside the Fixed Line Rollout footprint) are currently being rolled out, with a number of areas active.